Quick Enquiry
By submitting you agree to our Terms & Conditions and Privacy Policy.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Case Studies

Decommissioning Case Studies

Kishorn Dry Dock - MV Kaami

Having run aground six miles off the North West coast Skye in March 2020, the MV Kaami was deemed unfit for purpose and required taking ashore for dismantling.

View Case Study

Flexible Flowlines

Many miles of flexible flowlines, risers and umbilicals play an important role in oil and gas production in the North Sea. During field decommissioning programmes these items need recovered and brought ashore.

View Case Study

Ithaca Energy - Midwater Arch Downsizing

The decommissioning programme for the Athena field saw the Mid Water Arch (MWA) – which had supported pipelines and control systems as they rose from the seabed – brought onshore for deconstruction and recycling. The 500Te structure was landed at the Nigg Energy Park.

View Case Study

BP - Umbilical Reel Recycling

We were contracted to recycle a large metal reel and the umbilical product spooled upon it after both had reached the end of their operational lives. Deemed unsafe to lift for transportation, the reel was dismantled onsite at Peterhead Port under a temporary licence we obtained from SEPA.

View Case Study
Decom Capabilities
Kishorn Dry Dock